New Road Improvements Planned At Walt Disney World

IMG_0934

As most of you know, there is a lot of construction going on at Walt Disney World. The roads and parking area at Downtown Disney are expanding quite rapidly and will be amazing once it’s all completed. Well, according to the Orlando Sentinel, there are other road improvements coming. Here’s what they had to say~

A $350 million bond issue by Reedy Creek, the Disney-controlled taxing district, will provide funding. There is no set schedule for the improvements, but they are expected within the next five years, Reedy Creek Deputy District Administrator Ann Blakeslee said.

A flyover will take resort traffic over the Magic Kingdom’s toll plaza, providing easier access to travelers heading to hotels such as the Contemporary and Polynesian Village resorts, said John Classe, a Reedy Creek deputy administrator. Right now hotel visitors must drive through the parking plaza, even though they don’t have to pay.

The road projects also include:

•A reconfiguration of Osceola Parkway at Victory Way, southeast of Disney’s Hollywood Studios and north of ESPN Wide World of Sports Complex. A traditional intersection will be replaced with a flyover design similar to that at state roads 50 and 436 near Orlando. The flyover would take Osceola Parkway traffic over Victory Way.

•An extension of Western Way to Avalon Road, or County Road 545. Currently Western Way ends around the Flamingo Crossings development under construction.

•A Center Drive bypass to the west that will allow traffic heading south off Reams Road more direct access to Floridian Way.
Residents on the Disney property who are handpicked by the corporation to live there voted last week on a referendum on the bond issue paying for the improvements. They voted 17-1 for approval.

Reedy Creek is also making steady progress on improvements to the road network near Downtown Disney. A ramp from eastbound Buena Vista Drive rising above the road and funneling drivers into the third story of a new parking garage should open Sept. 8. A half-mile spur extending off the westbound ramp leading from I-4 onto Epcot Center Drive should open in early October.

Special thanks to Sandra Pedicini at the Orlando Sentinel

Photo by TMSM

Michele
Follow Me

Michele

Michele Atwood is the Owner/Editor of The Main Street Mouse and it’s subsidiaries and author of the books “Moving to Main Street U.S.A.” “How Many Sleeps Till Disney?” and “How Many Sleeps Till Disneyland?” Michele also contributes Disney news to the Joe Kelley Morning Show on 96.5 WDBO in Orlando. She and her family made the move from Michigan to the Orlando area to pursue their Disney dreams. Michele is a life long Disney fan, and has two sons who have followed suit, each going on their first Disney trip before their first birthday’s. Part of the goal Michele has for The Main Street Mouse is not only to keep members informed, but to create somewhat of a Disney Family by relating to others through personal experiences and opinions. Also, Michele is making it a priority to share stories of inspiration and hope to other Disney Fans in an effort to share the Magic and hopefully make a difference in the lives of others. ~ I enjoy writing personal perspective blogs, doing TMSM Meet Ups for our readers, and keeping the constant interaction going with others, sharing the Disney Magic to people when they can’t be at their Happy Place.

Michele has 5722 posts and counting. See all posts by Michele

mm

Leave a Reply

Do NOT follow this link or you will be banned from the site!